General Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this power unit is made for the operation of two independent circuits. Which are respectively to the most important and subordinate platforms from the double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in situation of power loss. If far more independent circuits are needed for the application please make contact with us for availability.
Remark: 1. Please check with our income engineer for the distinct pump displacement, motor energy or tank capability.
2. CSA or UL licensed motors are available on request.
Unique Notes
1. The AC motor is of S3 duty cycle, which might only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic components concerned before installation of the power unit.
three. Viscosity with the oil shoud be 15~46 cst,as well as oil need to be clean and free of impurities,N46 hydraulic oil is encouraged.
4. The power unit ought to be mounted vertically.
5. Check the oil degree in the tank immediately after the preliminary running of the energy unit.
6. Oil changing is required soon after the initial 100 operation hrs,afterwards after each 3000 hrs.