1.A connecting hyperlink of an O-ring Chain for standard application is pre-coated with grease on the pins. Before connection, confirm the grease about the surfaces of pins, and in the event the quantity of grease is little, apply grease with bare hands. (If gloves are utilised, the grease is going to be absorbed through the gloves.)
Instance: Once the connecting website link (I) of an O-ring chain for standard application is
shipped, O-rings are fitted at the roots in the pins. In the event the O-rings come loose as a consequence of vibration all through transport, refit the O-rings in to the roots on the pins.
In this case, you’ll want to return the grease collected at the roots on the pins on the central surfaces of the pins, much more at portion A than at portions B shown from the over illustration. (Portions A is worn on account of sliding with all the bushings.)
two.The chain could be most effortlessly connected over the teeth of the sprocket. Engage the links at each ends on the chain with all the sprocket teeth and fit connecting pins. Should the sprocket might be moved, the chain can also be linked to the loosened side.
three. Connecting method
one.Verify that O-rings are connected to the roots with the pins.
two.In the event the amount of grease utilized on the connecting pins is tiny, coat the pins with grease on the central portions.
3.Insert the connecting pins in to the bushings in the inner hyperlinks at the two ends.
four.Verify the grease is utilized to your whole encounter of the O-ring, and fit the O-ring onto the connecting pins.
5.Insert the connecting pins in to the connecting plate and although pressing the connecting plate, set up the spring clip. Confirm whether or not the head (the end with no split) in the spring clip is turned in the feeding path with the chain. (See the following illustration.)
6.Make sure you confirm the spring clip is securely fitted during the clip grooves of your connecting pins.
This completes jointing of your connecting link. Note that grease to the surfaces of connecting pins and O-rings might be eliminated throughout set up operate. In this instance, re-grease applying the grease over the surface with the base chain or the grease while in the polyethylene bag by which the connecting link was contained.